PLASTWOOD constructed most of the fencing that has been done so far on the Greek railway network. The following types stand out in the fencing of the railway network:

1. RAILWAY LINE FENCING 1.90m
Our company has supplied the materials and has also installed the 1.90m height fence in all the projects in which the specific fencing was required.

These projects are the following:

  1. Construction for the New Double High Railway Line of Tithorea – Lianokladi in the section from km 19 to 40.
    Fencing length: 25,000m.
  2. Works for the completion of the new railway line between R.S. Evangelismou and R.S. Leptokarya.
    Fencing length: 45.000m
  3. Construction of the New Double Railway Line Piraeus – Thessaloniki (Ekklisaki area)
    Fencing length: 3,000m
  4. Construction of Thriasio Pedio station complex. First Operational Phase.
    Fencing length: 5,000 meters.
  5. Infrastructure Construction of the New Double High Railway Line of high speeds Lianokladi – Domokos / 470.
    Fencing length: 4,000 meters.
  6. Construction of Remaining Infrastructure, Subsidy, Signaling-Telecommunication, Telecommunications & Electromechanical Installations of Tunnels for the New Railway Line Kiato – Rododafni.
    Fencing length: 96,000 meters.
  7. Remaining works for the completion of the infrastructure and the building installations, the E / M installations, the signaling and the electrification of the new double high-speed railway line Tithorea – Domokos AD 635- Subproject C ‘.
    Fencing length: 43,000 meters.
  8. Remaining works in the section Tithorea – Domokos, Contract 635
    Fencing length: 25,000 meters.
  9. Construction of of Thessaloniki – Eidomeni variant in the Polykastro – Eidomeni section
    Fencing length: 38,000 meters.
  10. Construction of infrastructure of a new double railway line in the section Rododafni – Psathopyrgos and Panagopoulas tunnel (ID 579)
    Fencing length: 5,000 meters.
  11. Construction of infrastructure of a new double railway line in the section Rododafni – Psathopyrgos and Panagopoulas tunnel (ID 579) positions
    Fencing length: 26,000 meters.

2. RAILWAY LINE FENCING 1.60m

Constructed parts:

  • Construction of remote control and telecommunications signaling allowance for the SKA-KIATO line, security works for the Elefsina – Kiato line. Length 19,000m
  • Construction of additional projects for the infrastructure of the OSE line in the section Ano Liosia – Thriasio. Length 10,000m
  • Upgrading works of the other sections of the existing railway line in the area of Oinoi – Tithorea. Length 37,000m
  • Construction of earthworks and technical works for the infrastructure of the new double high-speed railway line between Corinthos – Kiato . Length 28.000m
  • Construction of earthworks and technical works for the infrastructure of the new double railway line in the area of Domokou – Thessaloniki. Length 115,000m
  • General renovation of Thessaloniki – Eidomeni line. Length 35,000m
  • Upgrading of the Thessaloniki – Alexandroupolis railway line Length 36,000m
  • Upgrading of the railway line Thessaloniki – Alexandroupolis. Length 54,000m
  • Upgrading of the Alexandroupolis – Ormenio railway line between SS Soufliou – S.S. Didymoteicho. Length 7,000m
  • Upgrading of the railway line Thessaloniki – Alexandroupolis between SS Doiranis – S.S. Kastanias. Length 32,000m